C3 Construction SiteStak System Delivery
Case Study

C3 Construction invests in drainage material management

Leicester groundwork and civil engineering firm C3 Construction Ltd chose a bright orange paint scheme for their SiteStak workstations to ensure they stand out.

When choosing their SiteStak storage system, Leicester groundwork and civil engineering contractors C3 Construction Ltd chose a bright orange paint scheme to make sure it would stand out on site.

The SiteStak system combines mobile construction site storage for groundworks pipes and fittings with a handy workstation where pipe can be cut and prepared for installation.

This brings many benefits for the contractor:

  • Less damage – products are protected from damage by plant machinery
  • Less waste – surplus fittings are returned to a central store for later use rather than discarded around the site
  • Less risk – storing materials properly reduces the risk of trip hazards.
C3 Construction SiteStak moving with excavator forks